trenchless industry greenfield

Pilot Tube Method Put to the Test in Kentucky

February 6, 2016
When MAC Construction and Excavating, of New Albany, Ind., faced the challenge of being more than 30 ft deep and needing to cross a 175-ft wide branch off of the Ohio River for a 16-in. sewer, they knew who to call — the contractor that it has almo...